News Release | Agendas/Minutes |  Resource Links |  Home
Newsletter - Grass Valley City Messenger
Page 3
 


Page 1

Page 2

Page 3

Page 4

Page 5

Page 6

Page 7

Page 8

Download PDF
(large file)

Planning for the Future


The City of Grass Valley’s 2020 General Plan designates four Special Development Areas (SDA’s) to be master planned and ultimately annexed. Each SDA is to be master planned to address infrastructure needs and community desires. The City has been evaluating information to ensure that the SDA’s will incorporate the community amenities that Grass Valley will need in the future such as roads, parks, affordable housing and job opportunities. The SDA applications have been on hold until the City Council is satisfied that they have sufficient information about the future trends and needs of Grass Valley.

 

Holiday Inn Express Gold Miners Inn
Under Construction — Fall or Winter Opening Projected


Construction is under way with the Gold Miners Inn, a hotel and conference center located at 121 Bank Street. The project includes 80 rooms, meeting and conference rooms, and commercial/retail space. The project would have two driveways onto Bank Street, with the primary or entrance driveway located across from the Villa Venezia Restaurant and the second access located at the northwest corner of the property, closer to S. Auburn Street.

The lower floor of the building would be devoted to meeting rooms, reception area, retail and office uses, while the second and third floors are targeted for lodging. The lower floor retail space would have doorways opening onto Bank Street.

Exterior uses include parking, driveways or aisles, landscaping and three plazas (two are open for public use). Two of the three plazas front Bank Street, one adjoining the south end of the building and described as a “sidewalk plaza” and sized at 1,000 square feet. A “historical plaza,” adjoins Wolf Creek and totals 3,400 square feet in area. The third plaza or “event patio” is set in the rear of the building, encircled by a wrought fence with entry gates and approximates 3,500 square feet.

The planned completion date is in the fall or winter of 2006.

For more information contact Dan at 274-4330.



Copyright © 2004 City of Grass Valley. All rights reserved.
Content maintained by The City of Grass Valley  -2.1215146417E+19-
Design and hosting by New Press Websites