2010 SIDEWALK ACCESSIBILITY

Description:  Repair Sidewalks throughout town

Contractor:  Various/Multiple
Status:        Ongoing through FY 2011/12

DORSEY DRIVE INTERCHANGE

Description:
Construction of a full interchange at the intersection of Dorsey Drive and SR 20/49, and reconstruction of Dorsey Drive to include; sidewalks, bicycle lanes and transit stops from East Main Street to Pampas Drive.

Construction Management:  HDR, Inc.
Contractor: TBD
Status:        Environmental, design and right of way work completed.  Construction bid issuance planned for fall 2012.

Additional Information:
Environmental Documentation: Link to Website
Technical Studies   Part 1                  Part 2
Project Programming Request: PPR
Project Report
NCTC Support Letter
Draft Technical Specs
Draft Plans 1-50                        

Draft Plans 51-100               

Draft Plans 101-150                  

Draft Plans 151-200 

Draft Plans 201-250

Draft Plans 251-300

Draft Plans 301-339 

Quality Assurance Program             

Link to Stormwater Management Planning Document

Cooperative Agreement
Information Handout List and Item 1
Information Handout Items 2, 3 and 4
Information Handout Items 5, 6, 7, and 8


2008 WATER LINE PROJECT

Description:
Replacement of water line in Berryman Street

Contractor: Robinson Enterprises
Status:        Currently under construction

SR2S - WEST MAIN STREET

Description:
Sidewalk improvements and pavement rehabilitation on West Main Street between Alta Street and the west City Limits

Contractor:
TBD
Status         Design Complete. Scheduled to Bid Spring 2012 with Construction Summer 2012

MORGAN RANCH LIGHTING AND LANDSCAPING MODIFICATIONS

Description:
 Modification of the entry island

Contractor:  TBD
Status:         To be re-bid April 2012

JOYCE DRIVE LIFT STATION

Description:  Upgrade pumps, controls and appurtanances.

Contractor:  RE Smith Contractor
Status:         Estimated completion May 2012

CONDON AND MEMORIAL PARKS - ACCESSIBILITY IMPROVEMENTS

Description: Install accessible sidewalk and curb ramps from park entrance to park facilities

Contractor: TBD
Status:        Construction Summer 2012

SUTTON WAY ACCESSIBILITY IMPROVEMENTS

Description:  Construction of pedestrian improvements from 265 Sutton Way to Plaza Dr

Contractor:  TBD
Status:         Construction in summer 2012

EAST MAIN STREET AND HUGHES ROAD PEDESTRIAN IMPROVEMENTS

Description:  Construct missing segments of sidewalk and install bike lane

Contractor:   TBD
Status:          Construction in summer 2012

MAUTINO PARK PICNIC TABLES & SHADE STRUCTURE

Description:  Construct two concrete pads with picnic tables & shade sails

Contractor:  49er Rotary and volunteers
Status:         Under Design, construction spring/summer 2012

2012 STREET REHABILITATION

Description
:  Pavement rehabilitation of various streets throughout the City

Contractor:  TBD
Status:         Construction in summer 2012

2011 STREET REHABILITATION

Description:  Pavement rehabilitation of protions of varous City streets including; Taylorville Road and serveral streets in the St. Patrick's subdivision.

Contractor:  International Surfacing Systems
Status:        Completed December 2011

This project was partially funded by a Rubberized Asphalt Concrete Grant Program from the California Department of Resources Recycling and Recovery (CalRecycle).  Approximately 2,670 California waste tires were diverted from the waste stream for use in this project.


2010 STREET REHABILITATION PROJECT

Description:
Pavement rehabilitation of portions of Idaho-Maryland Road, Sutton Way, Dorsey Drive and the Cypress Hills subdivision.

Contractor:  Intermountain Slurry Seal
Status:        Completed September 2011

This project was partially funded by a Rubberized Asphalt Concrete Grant Program from the California Department of Resources Recycling and Recovery (CalRecycle).  Approximately 2,625 California waste tires were diverted from the waste stream for use in this project.



 
 
 
 
 