The Engineering Department is responsible for planning and managing the City's Capital Improvement Program (CIP), by preparing (or coordinating) engineering plans, specifications, cost estimates, and bid documents, and by inspecting and administrating construction contracts for CIP projects.
Updated 4/23/12
2010 SIDEWALK ACCESSIBILITY
Description: Repair Sidewalks throughout town
Contractor: Various/Multiple Status: Ongoing through FY 2011/12 |
2008 WATER LINE PROJECT
Description: Replacement of water line in Berryman Street
Contractor: Robinson Enterprises Status: Currently under construction |
SR2S - WEST MAIN STREET
Description: Sidewalk improvements and pavement rehabilitation on West Main Street between Alta Street and the west City Limits
Contractor: TBD Status Design Complete. Scheduled to Bid Spring 2012 with Construction Summer 2012 |
MORGAN RANCH LIGHTING AND LANDSCAPING MODIFICATIONS
Description: Modification of the entry island
Contractor: TBD Status: To be re-bid April 2012 |
JOYCE DRIVE LIFT STATION
Description: Upgrade pumps, controls and appurtanances.
Contractor: RE Smith Contractor Status: Estimated completion May 2012 |
CONDON AND MEMORIAL PARKS - ACCESSIBILITY IMPROVEMENTS
Description: Install accessible sidewalk and curb ramps from park entrance to park facilities
Contractor: TBD Status: Construction Summer 2012 |
SUTTON WAY ACCESSIBILITY IMPROVEMENTS
Description: Construction of pedestrian improvements from 265 Sutton Way to Plaza Dr
Contractor: TBD Status: Construction in summer 2012 |
EAST MAIN STREET AND HUGHES ROAD PEDESTRIAN IMPROVEMENTS
Description: Construct missing segments of sidewalk and install bike lane
Contractor: TBD Status: Construction in summer 2012 |
MAUTINO PARK PICNIC TABLES & SHADE STRUCTURE
Description: Construct two concrete pads with picnic tables & shade sails
Contractor: 49er Rotary and volunteers Status: Under Design, construction spring/summer 2012 |
2012 STREET REHABILITATION
Description: Pavement rehabilitation of various streets throughout the City
Contractor: TBD Status: Construction in summer 2012 |
2011 STREET REHABILITATION
Description: Pavement rehabilitation of protions of varous City streets including; Taylorville Road and serveral streets in the St. Patrick's subdivision.
Contractor: International Surfacing Systems Status: Completed December 2011
This project was partially funded by a Rubberized Asphalt Concrete Grant Program from the California Department of Resources Recycling and Recovery (CalRecycle). Approximately 2,670 California waste tires were diverted from the waste stream for use in this project.

|
2010 STREET REHABILITATION PROJECT
Description: Pavement rehabilitation of portions of Idaho-Maryland Road, Sutton Way, Dorsey Drive and the Cypress Hills subdivision.
Contractor: Intermountain Slurry Seal Status: Completed September 2011
This project was partially funded by a Rubberized Asphalt Concrete Grant Program from the California Department of Resources Recycling and Recovery (CalRecycle). Approximately 2,625 California waste tires were diverted from the waste stream for use in this project.

|
|
|
|
|
|
|